Hand in hand with China Power Construction-China Hydropower successfully helped Indonesia Bengkulu 2*100MW ignition and grid-connected power generation

CASE

Number of views:
1000

Hand in hand with China Power Construction-China Hydropower successfully helped Indonesia Bengkulu 2*100MW ignition and grid-connected power generation

China Water Resources and Hydropower Eighth Engineering Bureau Co., Ltd., the purchaser of the contract performed by our company this time, is the construction party of the Bengkulu coal-fired power station project in Indonesia won the bid by China Power Construction Corporation. In recent years, according to the group's development strategy, POWERCHINA has firmly grasped the national "One Belt, One Road" strategic opportunity, and carefully formulated and implemented the strategic plan of "expanding to the upstream of the industrial chain and deeply developing the Indonesian market".
Retail price
0.0
Market price
0.0
Number of views:
1000
Product serial number
Quantity
-
+
Stock:
0
Detailed
Parameters

Ignition oil pump of Bengkulu coal-fired power station in Indonesia--"Small and medium-sized enterprises integrate into the construction of the Belt and Road"
On the eve of the National Day, the main products independently developed by our company: Aike ignition oil pump and oil supply pump equipment were successfully sent to the construction site of the coal-fired power station in Bengkulu Province, Indonesia.

On September 24, our company received a contract order from China Water Resources and Hydropower Eighth Engineering Bureau Co., Ltd., requiring the purchase of 2 sets of A3MG-055/110-AHOKRA-G-A ignition oil pump set including motor complete sets of equipment. The delivery time is 3 days. Before 12:00 noon on the 28th, it will be directly sent to Indonesia after entering the warehouse from Shanghai Port. In the face of difficulties such as short delivery time, tight procurement time for some supporting parts, and heavy production tasks, the company's technology, production, procurement, logistics and other departments must ensure the delivery time and go all out to ensure that China Power Construction Corporation undertakes construction in accordance with General Manager Wang Xiaoguang. According to the requirements of the "Belt and Road" national strategic foreign engineering project construction progress", an emergency production scheduling meeting was immediately organized, and it was determined that the production plan should be arranged as a special order to ensure that the production and delivery tasks were completed on time. In accordance with the requirements of the meeting, each department set clear goals, carefully deployed, multi-point attack, and flexible scheduling. Employees in all positions actively and consciously worked overtime and completed product assembly, testing, paint packaging and logistics line communication and coordination in advance with high quality and quantity. At 9 am on the 27th, the truck was finished and sent to Shanghai Port.

On the evening of October 3, Wang Xiaoguang, the general manager of the company, took a flight to the construction site of the coal-fired power station project in Bengkulu Province, Indonesia, and actively cooperated with the engineering project department in the later installation and commissioning of the equipment. The ignition oil pump product that has obtained the national patent is indeed of excellent product quality, and the on-site service led by the general manager is in place, the hard station mode that supports in place and the continuous overnight overtime work on duty to ensure the normal and stable operation of the ignition oil pump. The Eighth Engineering Bureau of Water Conservancy and Hydropower-Gansu Energy and other co-production units are unanimously favored and praised.

China Water Resources and Hydropower Eighth Engineering Bureau Co., Ltd., the purchaser of the contract performed by our company this time, is the construction party of the Bengkulu coal-fired power station project in Indonesia that China Power Construction Corporation won the bid to build. In recent years, according to the group's development strategy, POWERCHINA has firmly grasped the national "One Belt, One Road" strategic opportunity, and carefully formulated and implemented the strategic plan of "expanding to the upstream of the industrial chain and deeply developing the Indonesian market". The Bengkulu coal-fired power station project in Indonesia, which participated in the investment and construction, started construction on October 25, 2016, with a total investment of about 360 million US dollars. It is expected to be successfully connected to the grid and put into commercial operation by the end of 2019. The construction of this project will play an active role in creating local jobs, driving the construction market, increasing government tax revenue, and promoting the realization of poverty reduction goals in Bengkulu Province. It has very important practical significance and far-reaching historical significance. Ken Machinery Manufacturing Co., Ltd. has continuously increased its independent research and development efforts over the years to enhance the scientific and technological content of its products. For the first time, the products have entered the equipment supporting project of the "One Belt, One Road" national development strategy construction project, which plays an active role in further enhancing the company's product competitiveness and enhancing the company's brand effect. .

中国电建-印尼明古鲁2×100MW火电项目部

Keyword:
construction
project
company
We could not find any corresponding parameters, please add them to the properties table

Related Products

Previous page
1

Consult now

If you have any needs, you can leave us a message, we will arrange personnel to contact you as soon as possible!

Username used for comment:
客户留言
Description:
verification code

AlKEN SCREW PUMP & SYSTEM

E-mail: cpo@akscrewpump.com
Add: BNo. 51, Huancheng West Road, Huizhou District, Huangshan City, Anhui Province

这是描述信息

Scan the QR code

CopyRight © 2022 Huangshan Aiken Machinery Manufacturing Co., Ltd. 皖ICP备13007750号-4

pic

皖 34100402000256号

SEO    Sitemap     Privacy protection     Legal notices     Powered by:300.cn

Links: